Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the modelβs assessment; readers can inspect the quote. Source: original document β
- β
Sidewalk closed for bridge sandblasting dailyβ536 [0 mi from Skagit Valley]: Expect intermittent closures of the sidewalk over the SR 536 Skagit River Bridge to pedestrians, bicyclists and people using mobility devices between 7 a.m. and 7 p.m. daily to sand blast the western span of the bridge. When the sidewalk is closed, a free, ADA-complaint shuttle service will be available, with pickup locations on both sides of the river.β
- β
Pedestrians, bicyclists and mobility device users face sidewalk closures on SR 536 Skagit River Bridge for sandblasting, with shuttle service available.β536 [0 mi from Skagit Valley]: Expect intermittent closures of the sidewalk over the SR 536 Skagit River Bridge to pedestrians, bicyclists and people using mobility devices between 7 a.m. and 7 p.m. daily to sand blast the western span of the bridge. When the sidewalk is closed, a free, ADA-complaint shuttle service will be available, with pickup locations on both sides of the river.β
- β
The SR 536 Skagit River Bridge sidewalk is closed to pedestrians, bicyclists and people using mobility devices between 7 a.m. and 7 p.m. daily for sandblasting work on the western span. A free ADA-complaint shuttle service will be available with pickup locations on both sides of the river during closures.β536 [0 mi from Skagit Valley]: Expect intermittent closures of the sidewalk over the SR 536 Skagit River Bridge to pedestrians, bicyclists and people using mobility devices between 7 a.m. and 7 p.m. daily to sand blast the western span of the bridge. When the sidewalk is closed, a free, ADA-complaint shuttle service will be available, with pickup locations on both sides of the river.β
- β
Eastbound traffic on SR 536 is closed for bridge repainting, requiring detours via eastbound SR 20 and southbound I-5. Westbound traffic remains open, and pedestrians, bicycles, and emergency vehicles may use the bridge in both directions.β536 [0 mi from Skagit Valley]: The SR 536 Skagit River Bridge is closed to eastbound traffic to repaint the bridge. Eastbound vehicles should detour using eastbound SR 20 and southbound I-5.
The bridge remains open to westbound traffic. Pedestrians bicycles and emergency vehicles may use the bridge in both directions.β
Source text saved for this check (2026-10-13T12:50:35.959Z)
WSDOT highway construction and road closures within 50 miles of Skagit Valley β 10/13/2026:
536 [0 mi from Skagit Valley]: Expect intermittent closures of the sidewalk over the SR 536 Skagit River Bridge to pedestrians, bicyclists and people using mobility devices between 7 a.m. and 7 p.m. daily to sand blast the western span of the bridge. When the sidewalk is closed, a free, ADA-complaint shuttle service will be available, with pickup locations on both sides of the river.
More on project webpage.
Effective: Oct 7, 2026, 8:54 AM
536 [0 mi from Skagit Valley]: The SR 536 Skagit River Bridge is closed to eastbound traffic to repaint the bridge. Eastbound vehicles should detour using eastbound SR 20 and southbound I-5.
The bridge remains open to westbound traffic. Pedestrians bicycles and emergency vehicles may use the bridge in both directions.
More information on project webpage
Effective: Jun 5, 2026, 9:06 AM
005 [1 mi from Skagit Valley]: The right lane of northbound I-5 will close from 8 p.m. Wednesday, Oct. 14, to 4:30 a.m. Thursday, Oct. 15, between Sherman Anderson Road and Kincade Street (mileposts 225-226) for maintenance work.
Effective: Oct 9, 2026, 10:09 AM
Expected end: Oct 15, 2026, 4:30 AM
020 [12 mi from Skagit Valley]: The temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period. An advisory speed of 30 mph is posted through a curve where banking was removed.
Construction of a new roundabout at the intersection will resume in spring 2027.
Effective: Sep 4, 2026, 8:25 AM
009 [13 mi from Skagit Valley]: Northbound and southbound SR 9 will alternate from 9 p.m. Thursday, Oct. 15, to 5 a.m. Friday, Oct. 16, near Finn Settlement Road (milepost 36) for utility work.
Effective: Oct 9, 2026, 12:02 PM
Expected end: Oct 16, 2026, 5:00 AM
005 [13 mi from Skagit Valley]: Northbound I-5 will be reduced to a single lane from 8 p.m. to 5 a.m. nightly Monday, Oct. 12, through Friday morning, Oct. 16, near the Alger/Lake Samish Road exit (milepost 240-242) for construction as part of a project correcting 17 barriers to fish migration.
Effective: Oct 9, 2026, 9:22 AM
Expected end: Oct 16, 2026, 5:00 AM
005 [18 mi from Skagit Valley]: The right shoulder of southbound I-5 will close from 8:30 a.m. to 3:30 p.m. Tuesday, Oct. 13, near Portage Creek Bridge for guardrail repairs.
Effective: Oct 9, 2026, 10:12 AM
Expected end: Oct 13, 2026, 3:30 PM
525 [22 mi from Skagit Valley]: Northbound and southbound SR 525 will alternate from 9 a.m. to 2:30 p.m. daily Monday and Tuesday, Oct. 12-13, near Admiral Drive (milepost 30) for utility work.
Effective: Oct 9, 2026, 1:37 PM
Expected end: Oct 13, 2026, 2:30 PM