← The Skagit Wire
Infrastructure

Skagit River Bridge Closed Until Project Completion

πŸ”Š Listen Β· narrated by Aiden

The SR 536 Skagit River/Division Street Bridge will remain closed in both directions until a painting and preservation project finishes construction, according to WSDOT. Emergency vehicle, pedestrian, and bicycle access remains open in both directions.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    Skagit River Bridge Closed Until Project Completionβ€œ536 [0 mi from Skagit Valley]: The SR 536 Skagit River/Division Street Bridge will remain closed in both directions until a painting and preservation project finishes construction. Updates will be provided on a blog about the closure.”
  • βœ“
    SR 536 Skagit River/Division Street Bridge remains closed in both directions starting Nov. 1, 2026, with updates on WSDOT's blog.β€œ536 [0 mi from Skagit Valley]: The SR 536 Skagit River/Division Street Bridge will remain closed in both directions until a painting and preservation project finishes construction. Updates will be provided on a blog about the closure. Emergency vehicle, pedestrian, bicycle access remains open in both directions. Effective: Nov 1, 2026, 5:00 PM”
  • βœ“
    The SR 536 Skagit River/Division Street Bridge will remain closed in both directions until a painting and preservation project finishes construction, according to WSDOT. Emergency vehicle, pedestrian, and bicycle access remains open in both directions.β€œThe SR 536 Skagit River/Division Street Bridge will remain closed in both directions until a painting and preservation project finishes construction. Updates will be provided on a blog about the closure. Emergency vehicle, pedestrian, bicycle access remains open in both directions.”
Source text saved for this check (2026-11-03T08:31:12.776Z)
WSDOT highway construction and road closures within 50 miles of Skagit Valley β€” 11/3/2026:

536 [0 mi from Skagit Valley]: The SR 536 Skagit River/Division Street Bridge will remain closed in both directions until a painting and preservation project finishes construction. Updates will be provided on a blog about the closure.

Emergency vehicle, pedestrian, bicycle access remains open in both directions.
Effective: Nov 1, 2026, 5:00 PM

009 [4 mi from Skagit Valley]: Northbound and southbound SR 9 traffic will alternate from 10 a.m. to 3 p.m. daily Friday, Oct. 30, and Friday, Nov. 6, near Mount Vernon Big Lake Road as work continues on a new fish-passable structure over a tributary to Nookachamps Creek.
Effective: Oct 23, 2026, 11:33 AM
Expected end: Nov 6, 2026, 3:00 PM

020 [4 mi from Skagit Valley]: Nightly from 9 p.m. to 5 a.m. the next day (except Friday, Saturday) beginning Wednesday, Nov. 4 to 5 a.m. Tuesday, Nov. 10, the right lane of eastbound State Route 20 at Peacock Lane (milepost 61) will close for utilities work.
Effective: Oct 29, 2026, 5:21 PM
Expected end: Nov 10, 2026, 5:00 AM

009 [6 mi from Skagit Valley]: From 8 a.m. to 3:30 p.m. Tuesday, Nov. 3, State Route 9 traffic will alternate with flaggers at Walker Valley Road (milepost 46) for maintenance.
Effective: Oct 30, 2026, 4:23 PM
Expected end: Nov 3, 2026, 3:30 PM

009 [6 mi from Skagit Valley]: From 9 p.m. Thursday, Nov. 5 to 5 a.m. Friday, Nov. 6, State Route 9 traffic will alternate with flaggers at West View (milepost 45) for utilities work.
Effective: Oct 29, 2026, 5:42 PM
Expected end: Nov 6, 2026, 5:00 AM

005 [7 mi from Skagit Valley]: From 8:30 a.m. to noon Wednesday, Nov. 4, the right lane of southbound Interstate 5 at Samish River (milepost 234) will close for maintenance.
Effective: Oct 30, 2026, 4:38 PM
Expected end: Nov 4, 2026, 12:00 PM

005 [9 mi from Skagit Valley]: From 10 p.m. Tuesday, Nov. 3 to 5 a.m. Wednesday, Nov. 4, the left lane of southbound Interstate 5 at Bow Hill Road (milepost 235) will close for maintenance. This work may also need to occur overnight Wednesday, Nov. 4.
Effective: Oct 29, 2026, 5:52 PM
Expected end: Nov 5, 2026, 5:00 AM

020 [12 mi from Skagit Valley]: The temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period. An advisory speed of 30 mph is posted through a curve where banking was removed.

Construction of a new roundabout at the intersection will resume in spring 2027.
Effective: Sep 4, 2026, 8:25 AM

The Skagit Wire is free. Get Skagit Valley's news delivered every morning.