← The Skagit Wire
Infrastructure

SR 536 Bridge Closed for Repainting

πŸ”Š Listen Β· narrated by Aiden

The SR 536 Skagit River Bridge is closed to eastbound traffic to repaint the bridge, effective June 5, 2026, with eastbound detours required via eastbound SR 20 and southbound I-5. The bridge will remain open to westbound traffic until Sunday, Nov. 1, when both directions will close to expedite project completion.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    SR 536 Bridge Closed for Repaintingβ€œ536 [0 mi from Skagit Valley]: The SR 536 Skagit River Bridge is closed to eastbound traffic to repaint the bridge. Eastbound vehicles should detour using eastbound SR 20 and southbound I-5.”
  • βœ“
    Eastbound traffic closed on Skagit River Bridge until Nov. 1; westbound open until Sunday.β€œThe SR 536 Skagit River Bridge is closed to eastbound traffic to repaint the bridge. Eastbound vehicles should detour using eastbound SR 20 and southbound I-5. The bridge remains open to westbound traffic until Sunday, Nov. 1, when both directions will close to expedite project completion. Pedestrians bicycles and emergency vehicles may use the bridge in both directions.”
  • βœ“
    The SR 536 Skagit River Bridge is closed to eastbound traffic to repaint the bridge, effective June 5, 2026, with eastbound detours required via eastbound SR 20 and southbound I-5. The bridge will remain open to westbound traffic until Sunday, Nov. 1, when both directions will close to expedite project completion.β€œ536 [0 mi from Skagit Valley]: The SR 536 Skagit River Bridge is closed to eastbound traffic to repaint the bridge. Eastbound vehicles should detour using eastbound SR 20 and southbound I-5.”
Source text saved for this check (2026-10-26T06:57:24.690Z)
WSDOT highway construction and road closures within 50 miles of Skagit Valley β€” 10/25/2026:

536 [0 mi from Skagit Valley]: The SR 536 Skagit River Bridge is closed to eastbound traffic to repaint the bridge. Eastbound vehicles should detour using eastbound SR 20 and southbound I-5.

The bridge remains open to westbound traffic until Sunday, Nov. 1, when both directions will close to expedite project completion. Pedestrians bicycles and emergency vehicles may use the bridge in both directions.
Effective: Jun 5, 2026, 9:06 AM
Expected end: Nov 1, 2026, 4:00 PM

009 [4 mi from Skagit Valley]: Northbound and southbound SR 9 traffic will alternate from 10 a.m. to 3 p.m. daily Monday and Tuesday, Oct. 27-28, and Friday, Oct. 30, near Mount Vernon Big Lake Road as work continues on a new fish-passable structure over a tributary to Nookachamps Creek.
Effective: Oct 23, 2026, 11:33 AM
Expected end: Oct 30, 2026, 3:00 PM

020 [12 mi from Skagit Valley]: The temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period. An advisory speed of 30 mph is posted through a curve where banking was removed.

Construction of a new roundabout at the intersection will resume in spring 2027.
Effective: Sep 4, 2026, 8:25 AM

005 [13 mi from Skagit Valley]: Northbound I-5 will be reduced to one lane from 8 p.m. to 5 a.m. nightly Sunday, Oct. 25, to Friday morning, Oct. 30, near Alger/Lake Samish Road (milepost 240-242) as work continues on a project correcting 17 barriers to fish migration near Lake Samish.
Effective: Oct 23, 2026, 10:57 AM
Expected end: Oct 30, 2026, 5:00 AM

005 [15 mi from Skagit Valley]: Southbound I-5 will be reduced to one lane from 8 p.m. to 5 a.m. nightly Sunday, Oct. 25, to Thursday morning, Oct. 29, near Alger/Lake Samish Road (milepost 242-240) as work continues on a project correcting 17 barriers to fish migration near Lake Samish.
Effective: Oct 23, 2026, 11:12 AM
Expected end: Oct 29, 2026, 5:00 AM

530 [17 mi from Skagit Valley]: Northbound and southbound SR 531 will alternate from 8:50 a.m. to 1:50 p.m. Monday, Oct. 26, near 11th Avenue Northeast (milepost 5) for utility work.
Effective: Oct 23, 2026, 2:55 PM
Expected end: Oct 26, 2026, 1:50 PM

005 [18 mi from Skagit Valley]: Northbound I-5 will be reduced to a single lane from 8 p.m. to 5 a.m. nightly Tuesday, Oct. 27, and Thursday, Oct. 29, north of North Lake Samish Road (exit 246) as work continues on a project correcting 17 barriers to fish migration near Lake Samish.
Effective: Oct 23, 2026, 11:23 AM
Expected end: Oct 30, 2026, 5:00 AM

005 [19 mi from Skagit Valley]: The right lane of southbound I-5 will close from 8 p.m. Thursday, Oct. 29, to 5 a.m. Friday, Oct. 30, near the North Lake Samish Road (exit 246)  as work continues on a project correcting 17 barriers to fish migration near Lake Samish.
Effective: Oct 23, 2026, 11:26 AM
Expected end: Oct 30, 2026, 11:26 AM

The Skagit Wire is free. Get Skagit Valley's news delivered every morning.