Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the modelβs assessment; readers can inspect the quote. Source: original document β
- β
SR 536 bridge repainting causes eastbound closureβ536 [0 mi from Skagit Valley]: The SR 536 Skagit River Bridge is closed to eastbound traffic to repaint the bridge. Eastbound vehicles should detour using eastbound SR 20 and southbound I-5.β
- β
Eastbound SR 536 Skagit River Bridge closed to repaint; westbound open, pedestrians and bikes allowed. Shuttle service available during sidewalk closures.β536 [0 mi from Skagit Valley]: The SR 536 Skagit River Bridge is closed to eastbound traffic to repaint the bridge. Eastbound vehicles should detour using eastbound SR 20 and southbound I-5.
The bridge remains open to westbound traffic. Pedestrians bicycles and emergency vehicles may use the bridge in both directions.β
- β
Eastbound traffic on SR 536 Skagit River Bridge is closed for repainting, effective June 5, 2026. Westbound traffic remains open, with pedestrians, bicycles, and emergency vehicles allowed in both directions.β536 [0 mi from Skagit Valley]: The SR 536 Skagit River Bridge is closed to eastbound traffic to repaint the bridge. Eastbound vehicles should detour using eastbound SR 20 and southbound I-5.
The bridge remains open to westbound traffic. Pedestrians bicycles and emergency vehicles may use the bridge in both directions.
More information on project webpage
Effective: Jun 5, 2026, 9:06 AMβ
- β
Sidewalk closures for sandblasting will occur daily from 7 a.m. to 7 p.m., with a free ADA-compliant shuttle service available during closures. The shuttle pickup locations are on both sides of the river.βExpect intermittent closures of the sidewalk over the SR 536 Skagit River Bridge to pedestrians, bicyclists and people using mobility devices between 7 a.m. and 7 p.m. daily to sand blast the western span of the bridge. When the sidewalk is closed, a free, ADA-complaint shuttle service will be available, with pickup locations on both sides of the river.β
Source text saved for this check (2026-10-19T12:52:52.730Z)
WSDOT highway construction and road closures within 50 miles of Skagit Valley β 10/19/2026:
536 [0 mi from Skagit Valley]: The SR 536 Skagit River Bridge is closed to eastbound traffic to repaint the bridge. Eastbound vehicles should detour using eastbound SR 20 and southbound I-5.
The bridge remains open to westbound traffic. Pedestrians bicycles and emergency vehicles may use the bridge in both directions.
More information on project webpage
Effective: Jun 5, 2026, 9:06 AM
536 [0 mi from Skagit Valley]: Expect intermittent closures of the sidewalk over the SR 536 Skagit River Bridge to pedestrians, bicyclists and people using mobility devices between 7 a.m. and 7 p.m. daily to sand blast the western span of the bridge. When the sidewalk is closed, a free, ADA-complaint shuttle service will be available, with pickup locations on both sides of the river.
More on project webpage.
Effective: Oct 7, 2026, 8:54 AM
009 [12 mi from Skagit Valley]: Northbound and southbound SR 9 will alternate from 9 p.m. Thursday, Oct. 22, to 5 a.m. Friday, Oct. 23, north of Finn Settlement Road (milepost 26) for utility work.
Effective: Oct 16, 2026, 1:16 PM
Expected end: Oct 23, 2026, 5:00 AM
020 [12 mi from Skagit Valley]: The temporary speed limit on eastbound and westbound SR 20 is 40 mph near Campbell Lake Road (mileposts 45.48 to 46.62) during a six-month settlement period. An advisory speed of 30 mph is posted through a curve where banking was removed.
Construction of a new roundabout at the intersection will resume in spring 2027.
Effective: Sep 4, 2026, 8:25 AM
005 [13 mi from Skagit Valley]: The left lane of northbound and southbound I-5 will close from 8 p.m. to 5 a.m. nightly Sunday, Oct. 18, through Tuesday morning, Oct. 20, and at same times Thursday night, Oct. 22, for construction as part of a project correcting 17 barriers to fish migration.
Effective: Oct 16, 2026, 9:13 AM
Expected end: Oct 23, 2026, 5:00 AM
005 [13 mi from Skagit Valley]: The right lane of northbound I-5 will close from 8 p.m. to 5 a.m. nightly Tuesday, Oct. 20, through Thursday morning, Oct. 22, near Alger/Lake Samish (milepost 240-242) as part of a project correcting 17 barriers to fish migration. This work needs dry weather and may be rescheduled if rain is forecast.
Effective: Oct 16, 2026, 9:20 AM
Expected end: Oct 22, 2026, 5:00 AM
011 [14 mi from Skagit Valley]: Northbound and southbound SR 11/Chuckanut Drive traffic will alternate from 9 a.m. to noon Wednesday, Oct. 21, near Oyster Creek (milepost 10) for sign installation.
Effective: Oct 16, 2026, 9:40 AM
Expected end: Oct 21, 2026, 12:00 PM
005 [14 mi from Skagit Valley]: The northbound I-5 on- and off-ramps at Alger/Lake Samish Road (exit 240) will close from 8 p.m. to 5 a.m. nightly Tuesday, Oct. 20, through Thursday morning, Oct. 22, as part of a project correcting 17 barriers to fish migration. Signed detours will use Nulle Road (exit 242). This work needs dry weather and may be rescheduled if rain is forecast.
Effective: Oct 16, 2026, 9:24 AM
Expected end: Oct 22, 2026, 5:00 AM